Infrastructure

A Platform Built to Scale.

A milestone-driven roadmap backed by owned real estate, secured power, and scalable AI cluster infrastructure.

Footprint

Footprint

Four Sites. Two Continents. One Vision.

Each facility owned outright, purpose-designed for AI workloads, deployed only against confirmed enterprise demand.

Active Deployment

United States

Fall River, Massachusetts

- Flagship facility

- Scalable to 20 MW

- Fee-simple ownership

- GB300 NVL72 active

Active Deployment

United States

Fall River, Massachusetts

- Flagship facility

- Scalable to 20 MW

- Fee-simple ownership

- GB300 NVL72 active

Drag to Explore

Coming Soon

Planned

United States

Texas

- 120-acre hyperscale campus

- 345 kV grid connectivity

- Large-scale training clusters

- Maximum power density

Coming Soon

Planned

United States

Texas

- 120-acre hyperscale campus

- 345 kV grid connectivity

- Large-scale training clusters

- Maximum power density

Coming Soon

Planned

United States

Nevada

- Southwest U.S. presence

- Regional enterprise demand

- Data sovereignty compliance

Coming Soon

Planned

United States

Nevada

- Southwest U.S. presence

- Regional enterprise demand

- Data sovereignty compliance

Coming Soon

Planned

Asia-Pacific

Vietnam

- APAC entry point

- Sovereign AI programmes

- Data residency compliance

- Completes USA + APAC coverage

Coming Soon

Planned

Asia-Pacific

Vietnam

- APAC entry point

- Sovereign AI programmes

- Data residency compliance

- Completes USA + APAC coverage

Roadmap

A Roadmap Built to Scale

From 6 to 36 GB300 systems — modular, milestone-gated, capital-efficient. Each stage funds the next.

STAGE 1

Foundation

- 2 GB300 AI compute systems deployed
- Core facility operational
- Enterprise demand confirmed first
- Milestone-gated capital release

STAGE 1

Foundation

- 2 GB300 AI compute systems deployed
- Core facility operational
- Enterprise demand confirmed first
- Milestone-gated capital release

STAGE 2

Acceleration

- Up to 18 systems total
- Operational validation complete
- Additional sites activated
- Pro-rata rights for early partners

STAGE 2

Acceleration

- Up to 18 systems total
- Operational validation complete
- Additional sites activated
- Pro-rata rights for early partners

STAGE 3

Scale

- Full 36-system deployment
- Multi-continent footprint live
- Capital-efficient full-scale ops
- Defined path to premium institutional valuation

STAGE 3

Scale

- Full 36-system deployment
- Multi-continent footprint live
- Capital-efficient full-scale ops
- Defined path to premium institutional valuation

Why Now

Why Alliance 360AI is the Smart Move Now.

Early-stage entry with infrastructure-grade downside protection and a clearly defined growth path.

Early-Stage Entry Advantage

Infrastructure-grade downside protection with a clearly defined growth path from first deployment to full scale.

Milestone Capital

Each tranche released only upon achievement of verified operational and financial milestones. Capital protected at every step.

Priority Future Access

Early partners receive contractual pro-rata rights and priority allocation in all subsequent funding rounds.

Defined Path to Institutional Valuation

A targeted public market listing — backed by owned assets, contracted demand, and a fully operational platform.

Every Layer Engineered

For Next-Gen AI.

Every Layer Engineered

For Next-Gen AI.

Powering the Future of Intelligence with sustainable, high-performance AI infrastructure.


© 2026 Alliance 360 AI · Built for the Next Intelligence Era | Technology Background Stock Videos by Vecteezy



© 2026 Alliance 360 AI · Built for the Next Intelligence Era | Technology Background Stock Videos by Vecteezy